Futech
Pillars AI and Software Solutions Partners Begin
Pillars/ 04 Sustain/ 04.2 Hardware Supply
DISCIPLINE 04.2

Hardware Supply

Procurement as part of the appointment, on account, specified before it is bought. We hold the distribution relationships, so an unusual part does not mean finding a new supplier.

Hardware Supply: racked equipment, stock, or bench
What it covers

Six capabilities, specified against a design rather than against a discount.

01

Networking Equipment

Cisco, MikroTik, Ubiquiti, Cambium and HPE Aruba, specified against the network design rather than against whatever carried the best margin that month.

BrandsCisco, MikroTik, Ubiquiti, Cambium, HPE
Specified againstThe design, in writing
ConfiguredBefore delivery, on request
02

Servers and Storage

Dell servers and storage sized for the workload, with warranty terms chosen to match how critical the box is rather than defaulted to the cheapest tier.

BrandsDell, HPE
WarrantyMatched to criticality
IncludedBuild, burn-in, delivery
03

Workstations, Laptops and Peripherals

Standardised builds, so the tenth machine matches the first. That single decision makes support cheaper for years afterwards and makes replacements predictable.

Standard buildDefined and held
ImagingConfigured before delivery
Lead timeTypically 3 to 10 days
04

Multifunction Printers and Consumables

Devices and consumables on account, with the fleet supported rather than dropped at reception and forgotten about.

SuppliedDevices and consumables
DeliveryOn account, scheduled
SupportIncluded under managed IT
05

Structured Cabling and Passive Infrastructure

Cable, cabinets, patch panels, trunking and containment, from the same supply line as the active equipment, so nothing arrives mismatched on install day.

CoversCable, cabinets, panels, containment
SuppliedTo the cable schedule
BenefitOne delivery, one accountability
06

UPS and Power Infrastructure

UPS units, batteries and PDUs sized to hold the rack up long enough for the generator or the grid to return, with runtime stated rather than implied.

Sized onMeasured rack load
RuntimeStated in minutes
IncludedBattery replacement schedule
01

Specify

Equipment chosen against the design and written into the quote by part number.

02

Quote

One document, on account, with lead times stated per line.

03

Deliver

Configured and imaged before it arrives wherever that is possible.

04

Support

Warranty tracked and the asset register updated on your behalf.

Specified alongside

01.2

Network Infrastructure

The design this equipment is specified against.

Open →
03.1

Managed IT Services

Warranty, asset register and support, held together.

Open →
04.1

Solar and Power

UPS and battery, sized on measured load.

Open →
Begin

Open a supply account.

A single quote, a standing account for the equipment you replace each year, or help specifying something unusual.

Call or message
013 004 0019